Document Controller - Data Centre Construction, On-Site Sines
A global construction consultancy is seeking a professional to manage technical documentation for a
- scale data centre project based in Sines, Portugal. The successful candidate will ensure that all documentation is accurate and accessible, providing essential support for project delivery. Responsibilities include document control, coordinating with project teams, and training staff. Candidates must have proven document control experience in construction, strong attention to detail, and
- level English skills.
#J-18808-Ljbffr
- Informações detalhadas sobre a oferta de emprego
Empresa: Gleeds Localização: Sines
Sines, Setubal, PortugalPublicado: 1. 12. 2025
Vaga de emprego atual
Seja o primeiro a candidar-se à vaga de emprego oferecida!